Ok so we took a break to from cleaning to go out to the house and check the progress. Turns out they are working like crazy today. The house was so busy that by the time we tried to walk out all our doors were blocked by drywall or brick crews. We ended up going down to the basement and crawling out of the egress window.

The house is a total mess right now but the entire second floor drywall is done:








They were were probably about 80% done with the second floor, but this is the only picture I could get down there without getting in the way:

They also got our water system, breaker box (not fully hooked up or populated) and hot water heater installed as well as our gas line and water lines to the outside spigots:



And the brick masons were hard at work today as well, they got the west side of the garage finished up:


I think they are still working out there, so we will probably go out tomorrow and see what they got done. I'm expecting they will be finished with drywall.