Wednesday, November 11, 2015

Oven Install

Today they installed our double wall oven, so now all our appliances (that we are bringing in after closing) are installed:




So as you can see the kitchen is basically 100% done at this point, just missing a fridge. You may also notice there are a couple of extra lights over the island, the electricians were in the house today finishing up some of this work. We will replace these lights with pendants after we move in.

In general the house is basically done. There are only a few minor things to be added and so the construction is pretty much over. Now it is really just fixing imperfections and touching things up here and there and correcting things that were not done exactly as we were wanting.

We should see them start to get the house cleaned up and prepped for closing pretty soon. Our first walk through to address any issues is Friday morning and we have a pretty long list of things we want fixed. After that they will have until next Thursday to take care of them. At that point we will do our final verification walk before closing. So in summary the house is probably 99% done and they will have the bulk of that remaining 1% done by this time next week.

-Jacob

No comments: